News

Construction Update - July 30, 2024

31 July 2024

Central Site Progress

  • ReoTemp wireless temperature probes, CPU & software were installed and satisfactorily tested
  • The mechanical grinder mixer was commissioned and successfully tested
  • The overall site was inspected by John Paul, the RDEK’s qualified professional for the Organics Matter Recycling Regulation (OMRR). The site met the requirements of The Act.
  • Minor deficiencies existed that will be addressed over the next month
  • The site construction is considered to be substantially complete

Invermere Site Progress

  • ReoTemp wireless temperature probes, CPU & software were installed and satisfactorily tested
  • The electrical grinder mixer was wired and energized for commissioning and testing
    • The unit was successfully tested and commissioned with 2 loader buckets processed through the grinder mixer
  • The overall site was inspected by John Paul, the RDEK’s qualified professional for the Organics Matter Recycling Regulation (OMRR). The site met the requirements of The Act.
  • Minor deficiencies existed that will be addressed over the next month
  • The site is considered to be substantially complete

Sparwood

  • ReoTemp wireless temperature probes, CPU & software were installed and satisfactorily tested
  • The electrical grinder mixer was wired and energized for commissioning and testing
    • The unit was successfully tested and commissioned with 2 loader buckets processed through the grinder mixer
  • The overall site was inspected by John Paul, the RDEK’s qualified professional for the Organics Matter Recycling Regulation (OMRR). The site met the requirements of The Act.
  • Minor deficiencies existed that will be addressed over the next month
  • The site is considered to be substantially complete

Work to Follow Substantial Completion

  • Site operations plans need to be developed
  • Plans and Specifications to be submitted to MoE with Operations Plans in the next few weeks
  • Permit application to be developed by Transform Compost Systems
  • The RDEK needs to establish an operator for each site

More information will be provided in fall 2024 with regard to when facilities are planned for formal operation and processing.